A typical project
From kick‑off to go‑live, with one team at your side.
Introducing mona changes how a ward documents, hands over and bills. We run that change with you: one project team, a plan from the first workshop, and a signed acceptance at every milestone. Most wards go live about five months after the kick-off.
- MDR Class IIa
- ISO 13485
- ISO/IEC 27001
- BSI C5 Type 2
- Hospitals
- 45+
- Medical device types
- 200+
- European countries
- 7
More than an IT project
Introducing mona changes how a whole ward works
A patient data management system reaches into every shift. Nurses chart differently, physicians prescribe differently, and medical controlling bills from what the ward has documented. The server and the interfaces are the smaller part of the work, so we run every project as a change project.
Every professional group at the table from the first day
Nursing, physicians, medical controlling, IT and building services plan with us which documents move into mona and when, and we train the people who carry the change on their wards.
Your IT landscape as it is
Our team has worked with the hospital information systems, laboratory systems, device fleets and network rules of 45+ hospitals. Your IT gets a clear list of what we need and no surprises on the way to go-live.
One team with you until the ward runs on its own
One project team takes you from the kick-off through the first weeks on mona, and stays your contact afterwards.
Six phases
From the first workshop to the first shift
01 · Everyone · Prepare
Kick-off
One day at your hospital. The project team meets, and IT, technology, key users and medical controlling each start in their own workshop. The hardware is ordered.
02 · IT, building services · Build
Infrastructure
Server or cloud connection, the network, and a terminal at every bed. We deliver the hardware and test every bed space.
03 · IT, medical technology · Build
Interfaces
Hospital information system, laboratory, monitors and ventilators, each connected against a specification you sign and tested together.
04 · Key users · Build
Configuration
Your key users decide how the ward documents: standard medications, prescription sets, scores and reports. We build it with them.
05 · Key users, all staff · Go live
Training
We train your key users in depth, they train their colleagues, and the ward validates the configuration.
06 · Everyone · Go live
Go-live
The ward switches to mona with Clinomic on site through the first week, then our support team takes over.
The change on the ward
The ward moves to mona with a plan
A new system is only a success when the ward works differently with it. That is why the project covers the routines around mona as carefully as the software.
Train the trainer
Paper or a previous system, replaced in a planned order
ICU chart, ventilation protocol, fluid balance and checklists move into mona one by one, whether the ward documents on paper today or in another system. Your key users decide the order.
New routines ready on day one
Shift handover, prescription sets and daily goals are set up with the ward before the first shift on mona.
A downtime concept before go-live
An emergency document per patient every hour, a fallback device on the ward, and a procedure everyone has practised.
Billing correct from the first patient
Complex treatment codes and ventilation episodes are checked with medical controlling before the ward goes live.
FAQ
Questions hospitals ask before a project
How long does a project take?
Most wards go live about five months after the kick-off. The terminal arms are made to measure for each room and take the longest to arrive, so we order them first.
What do we need to provide?
Server capacity or a connection to the Clinomic Cloud, the network and power at every bed, and time from your key users. After the kick-off, your IT and building services receive a checklist from us.
Who trains our staff?
Your key users, after we have trained them in depth. They know the ward, train in its shift pattern and stay the first contact for their colleagues. Our application consultants support them throughout.
What happens when mona is unavailable?
Every ward goes live with a downtime concept: an emergency document for each patient, written every hour, a fallback device, and a procedure the team knows.
Can we add more wards later?
Yes. Further wards, the operating room, telemedicine or AI build on the same installation and the connections that already run.
Plan your project with us
Tell us about your ward and your systems, and we sketch the project plan with you, phase by phase.